Matheson Library to close from 28 November

The refurbishment of the Sir Louis Matheson Library at the Clayton campus is on the homestretch. The library will need to close over summer to commence the remaining works and speed up other construction activities. 

Matheson Library will be closed from Monday 28 November and will reopen on 20 February 2017.

Items currently on hold in Matheson will remain in the library for collection until the close of business on Friday 25 November. On Monday all holds items will be transferred to Law Library as the new pick-up location.

During this period of closure, Monash staff and students can:
  • use Search to request items held at Matheson Library for pick-up at the Law Library. That will be arranged as soon as possible; you will receive an email when they are ready for collection. 
  • return items due at any other library except Caulfield; after-hours returns available at Law Library.
  • find study spaces at the two other libraries on the campus.
  • get advice and ask questions at an Information point at any other library, through ask.monash.edu, or by telephone (03 9905 5054).
Due to the closure, 'Matheson' will not be available as a pick-up location for inter-campus loans.

We apologise for this disruption and ask for your patience over the summer as the Matheson Library's refurbishment comes close to completion in semester 1 2017.


Visit the Library website for more information. If you have any comments or concerns about the Matheson Library refurbishment project, please email fsd.feedback@monash.edu.
Share on Google Plus

About Heidi Binghay

This is a short description in the author block about the author. You edit it by entering text in the "Biographical Info" field in the user admin panel.

0 comments:

Post a Comment